Spring Opening Checklist
Use this when the cover is coming off and you need the pool circulating, tested, cleaned, and safe to evaluate without guessing at chemicals.
- Use this when the cover is coming off and you need the pool circulating, tested, cleaned, and safe to evaluate without guessing at chemicals.
- Free Chlorine
- pH
- Total Alkalinity
- Calcium Hardness
- CYA
- Do not add shock or algaecide before the pump is running and water is circulating
- Do not skip the drain cover and equipment safety inspection
Inspect equipment and test water before adding any chemicals.
- ✕Do not add shock or algaecide before the pump is running and water is circulating
- ✕Do not skip the drain cover and equipment safety inspection
Free Chlorine / pH / Total Alkalinity / Calcium Hardness / CYA
Opening day field checklist
Take this to the pad.
印刷用の開池チェックリスト
点検と安全
- □排水カバーが損傷なく確実に固定されていることを確認する
- □電気接続とボンディングを点検する
- □GFCI の動作を確認する
- □フェンス、ゲート、バリアを確認する
設備
- □冬用プラグを外し、排水プラグを再装着する
- □ポンプ、フィルター、ヒーターのユニオンを再接続する
- □ポンプを呼び水し、漏れを確認する
- □清掃後のフィルター圧を記録: ___ PSI
- □マルチポートバルブの位置を確認する
- □すべてのバルブが正しい位置にあることを確認する
水
- □スキマーの中央まで水を入れる
- □水質テスト前にポンプを 24 時間運転する
- □テスト: FC、pH、TA、CH、CYA
- □開池時の基準値を記録する
- □ポンプが 24 時間循環するまで薬剤を加えない
循環後
- □必要なら最初に pH を調整する
- □計算機に従って初回の塩素量を加える
- □CYA が目標未満なら追加する
- □追加後 48 時間待ってから CYA を再テストする
First 15 minutes: keep cover debris out
The fastest way to make opening harder is to dump cover water and decomposed debris into the pool.
Before power: inspect stop conditions
Find winter damage while the system is still quiet and not under pressure.
Restore water level and prime
A test result is not useful until the pool can mix and the pump can move water.
Test once the water has mixed
Opening chemistry starts with a result set, not a shopping list.
Choose the branch from the evidence
A clear pool, cloudy pool, green pool, and broken circulation system should not share one checklist.
Make only the justified additions
Sequential dosing makes the next test meaningful.
First 24 hours: clean, filter, retest
The first day proves whether opening actually stabilized.
リソース(1)
Weekly / Monthly / Quarterly Maintenance Routine Packet
A printable owner packet that turns weekly, monthly, and quarterly pool maintenance into one repeatable checklist.
印刷用の開池チェックリスト
点検と安全
- □排水カバーが損傷なく確実に固定されていることを確認する
- □電気接続とボンディングを点検する
- □GFCI の動作を確認する
- □フェンス、ゲート、バリアを確認する
設備
- □冬用プラグを外し、排水プラグを再装着する
- □ポンプ、フィルター、ヒーターのユニオンを再接続する
- □ポンプを呼び水し、漏れを確認する
- □清掃後のフィルター圧を記録: ___ PSI
- □マルチポートバルブの位置を確認する
- □すべてのバルブが正しい位置にあることを確認する
水
- □スキマーの中央まで水を入れる
- □水質テスト前にポンプを 24 時間運転する
- □テスト: FC、pH、TA、CH、CYA
- □開池時の基準値を記録する
- □ポンプが 24 時間循環するまで薬剤を加えない
循環後
- □必要なら最初に pH を調整する
- □計算機に従って初回の塩素量を加える
- □CYA が目標未満なら追加する
- □追加後 48 時間待ってから CYA を再テストする
Educational guidance only. Verify labels, manuals, local code, and site conditions before acting. Stop for electrical, gas, structural, drain, drowning, injury, emergency, or chemical-mixing risk.